bassboy1
Senior Member
I'm in the process of buying a piece of commercial land. Coastal Al. 1 acre. I guess the term is vacant developed land (has a driveway culvert, has utilities available on the property, etc, but has never been built). In a small commercial park that is largely unbuilt.
County UNzoned. Plan is to builds metal building for my business. Property is in flood zone X (above 500 year flood).
Contract is contingent on passing phase 1enviro, and survey. Original intention for survey contingency was to confirm property is indeed fully in zone X. However, when I called for survey quotes, the surveyor told me that from pulling up the map, he could tell me that it's fully in zone X, no need for a survey to answer that. But, that I still should do the topographic survey rather than just boundary because it will probably be required for building.
County does not require a topo survey for building unzoned property. County GIS topo map shows about 1' of gradient over the entire property. We're going to be building a basic rectangular metal building. Property looks like it was cleared 20+ years ago, but has that much growth on it since - none of that vegetation will be kept.
Cost of just the boundary survey is about $1000. Topo survey (which includes boundary) is about $2500.
Should i go ahead and get the topo, or just stick with the boundary survey alone?
County UNzoned. Plan is to builds metal building for my business. Property is in flood zone X (above 500 year flood).
Contract is contingent on passing phase 1enviro, and survey. Original intention for survey contingency was to confirm property is indeed fully in zone X. However, when I called for survey quotes, the surveyor told me that from pulling up the map, he could tell me that it's fully in zone X, no need for a survey to answer that. But, that I still should do the topographic survey rather than just boundary because it will probably be required for building.
County does not require a topo survey for building unzoned property. County GIS topo map shows about 1' of gradient over the entire property. We're going to be building a basic rectangular metal building. Property looks like it was cleared 20+ years ago, but has that much growth on it since - none of that vegetation will be kept.
Cost of just the boundary survey is about $1000. Topo survey (which includes boundary) is about $2500.
Should i go ahead and get the topo, or just stick with the boundary survey alone?
Last edited: