Footing cure time

hipster dufus

Senior Member
Poured a concrete footing to replace a deck post. Going to drill and bolt a post base. Any thoughts on cure time before i drill it?. Im in no hurry.
 

MudDucker

Moderator
Staff member
Depends on mix and temps, but 7 days would be the longest to have to wait.
 
Top